A TIMBER STRUCTURE BRINGS WARMTH AND COMFORT TO THIS LONDON SECONDARY SCHOOL

William Perkin C of E High School
William Perkin Church of England High School

Designed to meet the local demand for secondary school places, the school for 1450 students is the combined initiative of Twyford CofE High School, The London Borough of Ealing and The London Diocesan Board for Schools, for whom we have designed two other secondary schools (St Mary Magdalene Academy and Chelsea Academy).

The school’s specialism is science, being named after William Perkin, a nineteenth century chemist, who established science-based industry in the Greenford area, following his accidental discovery of ‘mauveine’ dye, the colour of which is subtly referenced in the school’s interior.

Key Information

Sector: Schools, Regenerative Design & Sustainability

Client: Kier Construction Ltd

Location: London Borough of Ealing

Completion: August 2013

Size: 11,279 sqm GIA

Spatial drama throughout provides an uplifting environment for all its users. That this was achieved on an extremely tight budget demonstrates the skill and experience of the design team working beyond all normal expectations.

RIBA Judges

WARMTH AND LIGHT

The building’s interior is characterised by dramatic top-lit interiors and exposed timber surfaces. Externally its composition offers both a shield to an urban motorway and a welcoming presence to its community. Orientated to reduce solar gain and noise impact, the general teaching spaces face northeast and northwest, reflecting the school’s outward looking philosophy. The atrium spaces in the four-storey ‘apex’ building, their rooflights above, and the running stair, dining and entrance areas, all express exposed CLT, bringing the warmth and lightness of timber into these dramatic interior spaces.

INNOVATIVE CONSTRUCTION

To meet a very tight programme (the school was required to be open within twelve months of construction work starting) the building was constructed using Cross-Laminated Timber (CLT). 
As a result, the four-storey superstructure was built in only four months using prefabricated timber panels making William Perkin the largest construction project in the UK using this form of construction at the time.

William Perkin Church of England High School

Team

Architect
Feilden Clegg Bradley Studios
Main Contractor
Kier Construction
Structural Engineer for CLT
Ramboll
Structural Engineer
AECOM
M&E Engineer
KPE
Landscape Architect
EDCO Design
Photography
Jim Stephenson

FCBStudios Team Leads

Awards

2015
RIBA Regional Award
2015
Civic Trust Award: Regional Finalist
2015
New London Architecture Award: Education - Built
2013
CE Award: BIM Project of the Year
2013
New London Architecture Award: Education - Shortlisted