Second Phase of Brabazon Housing revealed

12 September 2022

Podium Block 3 Brabazon Phase 2

A planning application for the next phase of housing within the Brabazon development has been submitted to South Gloucestershire Council.



This builds on the success of The Hangar District and will add 339 new homes, continuing the transformation of the former Filton Airfield site into a thriving new neighbourhood. The homes will be set amongst peaceful, tree-lined streets across a south-facing hillside and will include a mix of 107 two, three and four-bedroom houses, alongside 232 studio, one and two-bedroom apartments.



The FCBStudios designed plans have the same neighbourhood character as The Hangar District, set within a network of green spaces. The homes exceed the national space standards by 25% and their generous floor-to-ceiling heights and large windows bring in an abundance of natural light.



More flexible layouts meet the needs of modern family life and include more dedicated space for working from home.